[Group News] The incineration workshop of Mianyang Industrial Solid Waste Disposal Center project was successfully ignited
On October 18, Mianyang Dongjiang Environmental Protection Technology Co., LTD. Mianyang Industrial Solid waste disposal center project incineration workshop ignition ceremony was successfully held. Snow Wave Environment attended the ceremony as the contractor.At 10 am, Mianyang Dongjiang general manager Zhan Li guided the guests to visit the central control room of the incineration workshop and introduced the brief process of the central control process.At 10:18, with the start of the igniter, the main burner was lit, and the leaders on the scene witnessed the successful ignition and official launch of the Mianyang Industrial solid waste disposal Center project through the large screen. Mianyang Industrial Solid Waste Disposal Center is a central supervision project of Sichuan Province, with a total investment of about 420 million yuan, covering an area of about 230 mu. The first phase of construction will treat 25,000 tons of industrial hazardous waste annually, including 10,000 tons of incineration, 15,000 tons of landfill, and 37 types of hazardous waste, which can effectively fill the blank of hazardous waste disposal in Mianyang City. Relieve the disposal pressure of hazardous waste in Mianyang City and other areas of the province. After completion of the project, it will become a comprehensive industrial waste treatment and disposal base for harmless disposal and resource utilization of industrial solid waste, and take into account environmental emergency, testing, technology research and development and education and training. The hazardous waste incineration system of the rotary kiln of the project was constructed by Xuelang Environmental General contract.As one of the few domestic waste incineration disposal integrated mainstream supplier representatives of advanced technology, xuelang environment with the technological advantages and industrial foundation, success won the project EPC project, in charge of this hazardous waste incineration disposal engineering process system (20000 t/a, 70t/d) and its supporting facilities design, equipment supply, material procurement, installation, commissioning (including single-unit commissioning, linkage test and production trial run), technical training and technical services.The main members of the project department took a group photoSince the signing of the contract, Xuelang Environment has earnestly implemented the cultural concept of "responsibility, integrity, pragmatism and refinement", in strict accordance with the contract agreement and the needs of customers, organized the elite backbone to set up the project department, paid close attention to the implementation of a series of engineering construction tasks such as design, procurement, production, construction and commissioning, and meticulously ensured that the project was completed on schedule with quality and quantity. Make positive contribution to the hazardous waste disposal cause in Mianyang City.Bi Jinbo, Snow Wave Engineering Company10-19
[Group News] Shanghai Changying successfully completed the emergency cleaning work of Shengrui Electronics
Shengrui electronic fire accident reviewAt around 13:25 on April 22, 2021, a fire occurred in the anodes oxidation workshop of Shengrui Electronic Technology (Shanghai) Co., LTD., located at No. 113, Lane 171, Linsheng Road, Jinshan District, with an area of about 21,000 square meters of fire and smoke, resulting in 8 deaths (including 2 fire rescue personnel).After the accident, leaders at all levels attached great importance to it and instructed them to do a good job in scientific disposal and other related work. The building of Shengrui Electronics was seriously damaged due to the fire, all the internal equipment burned down and the roof burned through many places, and the demolition and cleaning work at the fire site needs to be carried out legally and in compliance. Shanghai Changying Environmental Protection Service Co., LTD. (hereinafter referred to as "Shanghai Changying"), as a hazardous waste disposal unit, immediately communicated with Shengrui Electronics, Tinglin Industrial Park, Tinglin Town government and Jinshan District Environmental Protection Bureau, and organized field investigations by business, technology, production and other departments to evaluate and analyze the feasibility and safety of demolition. The scene before the demolitionVarious departments of Shanghai Changying formed a detailed and rigorous overall demolition plan and solid waste disposal plan after making a lot of evaluation and demonstration of the safety and environmental protection of the site demolition, and successfully passed four rounds of expert review. It is determined that the company shall be responsible for the demolition work, and the equipment and incineration residue after on-site incineration shall be handed over to Shanghai Changying for disposal as solid waste. DismantlingThe demolition work officially began on September 7, and all the demolition processes were completed on September 25, with a construction period of only 18 days. After the fire, the equipment and materials after incineration are piled up in a messy way, and the hazardous waste cleaning can only be carried out after the equipment is dismantled and shipped out, which greatly reduces the working time of hazardous waste cleaning and brings unprecedented challenges to the transportation and reception of Shanghai Changying. Time is tight, the task is urgent, and it coincides with the Mid-Autumn Festival, the relevant staff of Shanghai Changying took the initiative to give up their vacation, stick to their posts, overcome difficulties, and cooperate closely with all departments to finish cleaning, packaging, shipping and receiving 668.17 tons of hazardous waste within 3 days. After removalShanghai Changying worked together to demonstrate responsibility and responsibility, so that the task was successfully completed, no secondary pollution occurred in the process of collection and transportation, and no safety accidents occurred.Photo, Text/Shanghai Changying Wang Lili10-12
Other gifts snow waves environment struggle "not closing"
Other gifts snow waves environment struggle "not closing"This year marks the 72nd anniversary of the founding of the People's Republic of ChinaOn this occasion of universal celebration,There's such a lovely group of people,Stick to the post and keep the schedule,With dedication and responsibility for the birthday of the motherland.Since the success of the baking furnace ignition oven on September 16, after more than half a month of operational personnel training and on-site equipment inspection and deficiency, the Wuxi Jiangfeng utilization and disposal of copper waste 100,000 tons/year safety and environmental protection improvement project contracted by Xuelang Environment EPC officially entered the full sprint trial production stage on October 1.In order to ensure that the trial operation of the Jiangfeng project can successfully meet the standards and reach the production, the technical and engineering staff of the Xuelang Environmental New Industry Development Center resolutely chose to give up their leave and volunteered to enter the Jiangfeng project, implementing the double duty system, and fully guaranteeing the trial production of the Jiangfeng project. On October 2, Project Manager Jiang Xiaoyong, together with Jiangfeng Company, Joint headquarters and the participating units, held a meeting to confirm the readiness of each equipment before trial production. At the meeting, the calibration and operation mode of dust collector, RTO, SCR and wet desulfurization equipment were formulated one by one. At 8 p.m. on October 3, the entire system was found to be out of alignment during the test transfer of the RTO inlet temperature. After receiving the notice from the central control room, electrical engineer Yu Fei rushed to the scene with spare parts to troubleshoot the problem and ensure the normal test transfer of the system. Night view of the project under the lens of Yu FeiOn the evening of October 4, with the "ignition" order of Zhang Hongxing, general manager of the project company, Jiangfeng project officially entered the trial production stage. Photo Note: CEMS data for roasting on October 5Jiangfeng Project is a successful test in the field of Xuelang environmental layout waste resource utilization. In the future, the new industrial development center will be driven by technological innovation to help Xuelang environment change."One set, Wan Shan unimpeded, let us together, refueling!" By Hu Zijian, New Industry Development Center10-07
A new starting point, a new journey - Snow Wave environment held the General Party Branch committee election conference and the inauguration ceremony of the General Party Branch
Forge ahead in a new era and start a new journey. On the afternoon of September 28, the election meeting of the General Party Branch members of the Snow wave Environment and the inauguration ceremony of the General Party Branch were successfully held, and more than 40 Party members of the General Party branch participated in the conference. Li Qing, Minister of the Party and Mass work Department of Wuxi Shanshui City, attended the meeting and participated in the unveiling ceremony. At the meeting, Li Qing read the Shanshui City Party Working Committee's "Reply on agreeing or adjusting the establishment of some party organizations in Shanshui City". In the impassioned music, Li Qing and Hu Jianmin, secretary of the last Party branch of Xuelang Environment, jointly unveiled the Party branch of Xuelang Environment. Subsequently, the meeting reviewed and approved the work report of the last branch committee, and in accordance with the election method adopted by the General Assembly, elected a new General Party branch committee composed of seven comrades, including Hu Jianmin, Jiang Hongyuan, Chen Zhuocheng, Cheng Xingzheng, Liu Hanzhong, Jiang Jianchun, Bian Chunxiang, and Comrade Hu Jianmin was elected as the secretary of the General Party Branch, and Comrade Jiang Hongyuan was elected as the deputy secretary of the General Party Branch. Hu Jianmin, the newly elected secretary of the General Branch of the Party, made a statement. He said that the establishment of the general branch of the Xuelang Environmental Party is a milestone in the history of the development of the Xuelang Environmental Party, and is a major, good and happy event in the political life of the Xuelang Environmental Party. The new team members will scrupulously fulfill their duties, innovate, learn and forge ahead, be strict with themselves, live up to expectations, and go all out to do a good job in the work of the General Party Branch. Hu Jianmin pointed outAfter the establishment of the Xuelang Environmental Party Branch, there will be three party branches under the comprehensive Party branch, the industrial Party branch and the Youth Party branch. The comprehensive branch focuses on the optimization of comprehensive management, the industrial branch focuses on the improvement of business ability, the youth branch focuses on the training of young talents, based on the "precision, precision, fine and strict", promotes the process of work, quantification and scientific, enhances the scientific level of party building, promotes the integration of party building and business, and gathers the majority of workers around the Party organization.Hu Jianmin stressedXuelang environmental party building work will open a new page, we should take this opportunity, with a new mental outlook, a new work style, a new work standard, strengthen learning, solid work. Integrate the leadership of the Party into every link of corporate governance, and give play to the role of the leadership core and political core of the party organization; Strengthen the inheritance and innovation of Party construction, and build Xuelang Environmental Party Branch into a strong fighting fortress; Strengthen the construction of Party conduct and clean government, and build a clean and pragmatic Xuelang environmental development team; All Party members and comrades should unite, support the work of the party branch, unite and struggle, forge ahead, and strive to create a new situation in the party building work of the snow wave environment!Miao Jiabin, Human Resources Department09-30
[Group News] Nanjing's outstanding collaborative anti-epidemic commendation, praise for your selfless dedication
After more than 30 days of thrilling battle against the epidemic, on September 17, Nanjing Excellence Environmental Protection Technology Co., LTD. (hereinafter referred to as "Nanjing Excellence") held a grand ceremony to commend the relevant teams and individuals who supported the fight against the epidemic. Yong Yonghui, chairman and general manager of Nanjing Excellence, delivered a speech on behalf of the company, thanking all employees for their unity, overcoming difficulties together, and successfully completing the tasks assigned by the Party and the people. Yongyonghui stressed that Nanjing Excellence has always respected the values of "being a responsible corporate citizen", and the cultural concept of "responsibility, integrity, pragmatism, and diligence" guided by the snow wave environment is in line with each other. In the process of this coordinated fight against the epidemic, the vast majority of employees were able to obey the overall situation and show their abilities, fully demonstrating the excellent mission and responsibility of Nanjing. In this fight against the epidemic, Nanjing Excellence not only accumulated valuable experience, but also made employees firm in fighting alongside the enterprise, sharing weal and woe, breathing and growing together. Jin Cheng, director of Anhuan, presented awards to outstanding individuals fighting the epidemic Chief engineer Cheng Xiangyong presented awards to outstanding individuals fighting the epidemicDeputy General manager Zhou Shilei awarded awards for outstanding individuals fighting the epidemic Yongyonghui, general manager, presented the Excellent Management Award for fighting the epidemicAfter the recognition ceremony, in order to catch up with the production schedule delayed by collaborative disposal and complete the annual production and operation targets with quality and quantity, Yongyonghui put forward two hopes:First, I hope that everyone will keep an eye on a goal, all departments and positions will perform their duties and work together to fight hard for 130 days;Second, I hope to continue to strengthen the two safety, namely production safety and fire safety, to fully ensure the smooth operation of the company. Graphic/Nanjing Excellence Shen Mi09-25
Snow wave equipment 5S management project launch conference
5S originated in Japan, and Japanese companies use the 5S movement as the basis for management work. Under the advocacy and implementation of Toyota, 5S has played a huge role in shaping the image of the enterprise, reducing costs, on-time delivery, safe production, a high degree of standardization, creating a pleasant workplace, site improvement, etc., and has been recognized by the management community of various countries.The implementation of "5S" management is an important strategic management measure of Wuxi Xuelang Environmental Equipment Technology Co., LTD. (hereinafter referred to as "Xuelang Equipment"), which aims to promote the standardization, standardization and refinement of the company's management, and further enhance the company's overall management level and brand image. At 9 am on September 16, 2021, Xuelang Equipment held the "CECM Xuelang Equipment 5S Management Reform Launch Conference", and invited a consulting company to guide the promotion of the 5S management project.At the beginning of the meeting, Jiang Hongyuan, deputy general manager of Xuelang environment, general manager of Xuelang Equipment and leader of the 5S leading group, gave a speech, he said that 5S management will be a new management basis for Xuelang equipment, and it is a goal to persevere, which can not only improve and enhance the spiritual outlook of employees and corporate image, It will also lay a solid foundation for the company's productivity improvement, delivery control, inventory turnover and other management. At the same time, Jiang Hongyuan stressed that the heads of departments of the 5S project are the first driving force, not only to improve the importance of the project, but also to start from myself, actively change the mind, fully mobilize the enthusiasm of employees, full participation, establish their own training system and 5S team, so that the entire project to process and standardization.Zhu Zhiwei, deputy general manager of Snow Wave Equipment, announced the organizational structure of the 5S management project team and the members of each team on the spot, and issued a letter of appointment for each team member. All employees of Snow Wave Equipment solemnly swear and sign. Continue to deepen lean managementIs the company to achieve production efficiency and qualityAn important measure for simultaneous promotionNeed usAccumulate from drop to dropStart smallConstantly promote the company's high-quality development图/文雪浪装备秦越09-22
The environmental competitiveness of the active layout of solid waste resource utilization of snow waves has become increasingly prominent
On September 14, 2021, Xuelang Environment held the tenth meeting of the fourth Board of Directors, and the meeting reviewed and passed the proposal on the new solid waste resource utilization project to be invested by the company's holding subsidiary. Nanjing Excellence Environmental Protection Technology Co., LTD., a subsidiary of Xuelang Environment Holdings, intends to invest in the construction of solid waste resource utilization project in order to extend the industrial waste comprehensive treatment industry chain, enhance the comprehensive competitiveness and expand the market share. The proposed investment amount of the project is estimated to be about 30,000 yuan. Within the original 133,686.47 square meters of the factory, 23,500 square meters of open space in the factory will be used to build waste storage and drying systems containing copper and nickel, raw material warehouse and feeding system, oxygen rich side-blown furnace melting, dust collection system, environmental smoke collection system, exhaust gas treatment system, wind room, oxygen generating station and public and auxiliary facilities. After the completion of the project, 120,000 tons of solid waste (wet base) will be processed annually, including 80,000 tons of hazardous waste (wet base) and 40,000 tons of general solid waste.Striving to achieve "carbon peaking" and "carbon neutrality" is the main theme of the pollution prevention and control battle during the "14th Five-Year Plan" period. In order to further improve the comprehensive utilization level of solid waste, promote energy conservation and carbon reduction in the comprehensive utilization of resources industry, and help achieve the goal of carbon peaking and carbon neutrality, In June 2021, the National Development and Reform Commission issued the "Notice on the Comprehensive Utilization Demonstration of bulk solid waste" (hereinafter referred to as the "Notice"), which proposed that by 2025, 50 large-scale solid waste comprehensive utilization demonstration bases will be built, and the comprehensive utilization rate of large-scale solid waste in the demonstration base will reach more than 75%, and 50 comprehensive utilization backbone enterprises will be cultivated. Implementation of demonstration to lead actions. Followed by the "14th Five-Year Plan" circular economy development Plan "also clearly stated that" by 2025, the implementation of circular production mode, green design and clean production are widely promoted, the comprehensive utilization of resources is significantly improved, and the resource recycling industrial system is basically established." The recycling network of waste materials has been improved, the recycling capacity of renewable resources has been further improved, and a resource recycling system covering the whole society has been basically completed. The efficiency of resource utilization has been greatly improved, the replacement ratio of renewable resources to native resources has been further increased, and the supporting role of circular economy in resource security has been further highlighted." We should adopt nature-based solutions, develop green finance, research and promote green technologies, develop a circular economy, and promote industrial transformation and upgrading." In the future, with the gradual introduction of relevant policies and the gradual landing of specific rules, the resource utilization of solid waste is bound to become the main development direction of future advocacy, and the prospect of resource utilization continues to improve.However, with the completion and operation of new hazardous waste disposal projects around the country and the addition of collaborative disposal of cement kilns and smelting kilns, the traditional hazardous waste disposal market competition using incineration, physicochemical, landfill and other disposal methods is becoming increasingly fierce. Nanjing Excellence's proposed investment in the resource utilization project is made on the basis of comprehensive consideration of the above related policy support and the current situation of market competition, which is conducive to breaking through the current Red Sea competition pattern faced by traditional disposal methods, and is conducive to extending the company's industrial waste treatment industry chain, which is the further implementation of the company's established development strategy. It is beneficial to bring new performance growth point to the company, and has positive significance to enhance the company's comprehensive competitiveness and expand market share.09-19
Safety production is always on the road - Snow wave Environmental Engineering company firmly grasp the safety line
Recently, Wuxi Snow waves Environmental Engineering Technology Co., LTD. (hereinafter referred to as the engineering company) held a special meeting on project safety, and the meeting proposed to be problem-oriented, focus on the key points, make up for weaknesses, strong and weak items, and promote the development of safety production work to the depth. Song Xin, vice president of Snow Wave Environment, general manager of engineering company, Tan Zhaoxia, deputy general manager of engineering company and project leaders attended the meeting.The meeting briefed and commented on the recent project site safety production inspection and the implementation of safety production work, analyzed and judged the current construction site safety production situation, and put forward relevant guidance.Song Xin, general manager of the engineering company, made a summary speech, he stressed that safety work is the premise of all work, we must focus on the implementation of weekly safety hazards investigation and rectification of the problem closed loop, safety production inspection normalization, effectively do all kinds of risk prevention and control, and resolutely curb the occurrence of safety accidents.Half a month since the meetingThe project managers on site strictly implement the meeting requirementsSafety hazards were investigated in 53 projects under constructionCheck and fill gaps in timeClose the hidden danger rectification loopBefore rectification: the ladder guardrail of the dust collector was not installed in time.After rectification: Install ladder guardrail to implement safety protection.Before rectification: Acetylene bottle without shading measures.After rectification: Cover the sun visor. Before rectification: dust collector scaffold is not standard, no acceptance certificate.After rectification: set the end protection according to the requirements of the code, set the waist bar, after acceptance, the suspension scaffold acceptance certificate.Before rectification: Small objects at the top of the wet tower are discarded at will, and there is a serious object strike security risk.After rectification: Clean up the small debris on the platform of each layer, set up a small bucket for special placement, and do not throw it randomly.According to the spirit of the meeting, the engineering company will further sort out the working mechanism and process, implement the main responsibility of safety production, consolidate the foundation of safety management, implement the responsibility of safety production, promote the participation of all employees in safety management, and form a good atmosphere for everyone to understand safety and prevent hidden dangers everywhere.By Ni Chenxi, Xuelang Environmental Engineering Company09-17
Successful ignition! Xuelang Environment EPC general contract Wuxi Jiangfeng utilization, disposal of copper-containing waste technical transformation project ignition and production
On the morning of September 16, Wuxi Jiangfeng, which was EPC contracted by Xuelang Environment and went through a 7-month construction period, successfully fired the rociner for 100,000 tons/year safety and environmental protection improvement transformation project of copper-containing waste, and officially put into hot trial production, marking the success of Xuelang Environmental New Industry Development Center in the field of waste resources. Wuxi Jiangfeng use and disposal of copper waste 100,000 tons/year technical transformation project started construction in early 2021, the project selected domestic mainstream hazardous waste disposal equipment, natural gas hot blast furnace rotary kiln drying, countercurrent roasting, static pressure brick machine double line block combination, side blowing reduction furnace smelting copper. Advanced environmental protection process facilities such as pulse-type bag dust removal system, regenerative combustion system (RTO), low-temperature denitrification reaction system (SCR), wet desulfurization system are safe and stable, and MVR evaporation process is used to achieve zero waste water discharge, and flue gas related emission indicators are far better than national and regional standards, reaching the advanced level of the same industry in China. Hu Jianmin, chairman and general manager of Xuelang Environment, pressed the start button for the project ignition.Due to the small site of the operation site and the urgent construction period, the new industry development center led the establishment of the joint headquarters of Jiangfeng Technical transformation Project, detailed task decomposition, layer upon layer compaction responsibility, and still stuck to the post during the Spring Festival. Through the full cooperation of all construction units, the smooth progress in accordance with the schedule, and successfully completed the scheduled construction tasks. Since the project broke ground, the Jiangfeng technical transformation project has been highly concerned and strongly supported by the local government and the group. After multi-party technical exchanges, the joint headquarters equipped an advanced side-blown melting furnace to carry out in-depth treatment of Jiangfeng's precious metal sludge, produce precious metal and vitreous slag (general solid waste), and realize complete recycling and closed-loop treatment of sludge disposal. The wastewater treatment reached zero discharge. In order to ensure a successful ignition operation, the construction team carefully planned and discussed the ignition operation scheme for many times. At the same time, the system equipment and facilities are adjusted and confirmed repeatedly. The new industry Development Center will take the ignition of this project as a new starting point, make unremitting efforts and forge ahead, take waste resources as the core, focus on new policies, new requirements, new ideas and new market demand for environmental protection development, and develop new fields, new directions and new models of industrial development; With the help of the Group's scientific research platform, universities and research institutes, we actively carry out industrial upgrading, accelerate the updating of technology and equipment, and create new business growth points and profit points.By Hu Zijian, New Industry Development Center09-16
Medical waste disposal, another battlefield in the epidemic prevention and control war - Nanjing Excellence collaborative treatment of medical waste documentary report
More than 20 days, more than 500 tons of medical waste disposal, an average of 25 tons/day, the peak can reach more than 40 tons, more than 1300 barrels...... With this round of COVID-19 under control, Nanjing has been revitalized, but these figures still bear witness to the "war" without smoke. Behind the figures, Nanjing Excellent Environmental Protection Technology Co., Ltd. adheres to its mission and has the "excellent feelings" of cooperating with medical waste management."Be a responsible corporate Citizen"With this round of Nanjing epidemic coming to an end, Nanjing Excellence Factory gradually returned to calm. Entering the factory, a striking slogan came into view - "Be a responsible corporate citizen", which witnessed everything that happened here not long ago. Time back to July 20, the new coronavirus outbreak in Nanjing suddenly arrived, the city has opened more than 300 centralized isolation points, medical waste has increased sharply, and the daily output has reached nearly 200 tons. In order to relieve the pressure of medical waste disposal, Nanjing Municipal Government issued a call to Nanjing Excellence to cooperate in the disposal of medical waste.To answer or not to answer? This became a choice for Nanjing's top management. The possibility of employees being infected, the impact on the original capacity indicators, the risk of the plant being locked down... There are too many uncontrollable factors, it is like a time bomb, buried in the factory, the crisis is everywhere."Duty-bound!" The four words of Hu Jianmin, chairman and general manager of Snow Wave Environment, are like a reassuring pill. For Nanjing Excellence, this is not actually a choice question, but a required answer. A special working group was urgently set up to issue an emergency plan for coordinated treatment of medical waste. At 8 o 'clock in the morning on July 31, the first emergency medical waste collection and transport vehicle entered the company, and the battle of Nanjing Excellence was officially started. Daily nucleic acid testing, investigation of sources of medical waste, meticulous elimination, closed-loop management of personnel, and strict management have brought tremendous pressure to the management. In order to dispel the concerns of front-line employees, the company's management, production managers, and workshop directors take the lead in going deep into the front line and standing with employees.External pressure is also mounting. Receive high-density research, respond to management requirements of different departments, face complaints from nearby residents... The managers of the company are faced with a series of difficult problems.Thousands of tasks need to be arranged, and all management personnel have never left the factory since taking on the difficult task, and are on standby 24 hours a day to coordinate and deal with various problems on site. "We are suffering every day. We are under a lot of pressure, but we don't want to pass the pressure on to our employees for fear of causing negative emotions or negative effects. Only we know the contradictions and hardships involved." Yong Yonghui, general manager of Nanjing excellence, sighs.After the hard came the sweet, the battle was won. "Companies like Nanjing Excellence should be supported by both local and municipal governments," said Huo Huiping, deputy mayor of Nanjing, during the on-site survey."A company has the wisdom and courage to stand up to many difficulties and help society shoulder risks. This is a responsible corporate citizen." Nanjing excellent management team commented on the medical waste disposal work.A war without smokeAlthough the battle against the epidemic has won victory, there are still some problems in the treatment of medical waste.August 2, is a particularly critical period of medical waste disposal, 5:40 p.m., due to the power increase, excessive load led to the fan coupling break, in the face of the company has no inventory, no related accessories, and the urgent situation of medical waste continued to come in, the relevant personnel led by the Ministry of Power Security worked overnight to solve the problem. Zhou Shilei, deputy general manager of Nanjing Excellence, was still at the scene at 3 am, dispatching and commanding, in order to solve the problem as soon as possible and ensure the normal disposal of medical waste.At 2 a.m. on August 3, the alternative plan was finalized; At 1 p.m., the new equipment enters; At 11 p.m., the induced draft fan started normally. Watching batches of medical waste being transported into the incinerator, all the personnel breathed a sigh of relief. At this time, a full 30 hours have passed since the failure occurred, and the sweat on their faces still seems to be telling the thrilling 30 hours of emergency repair. "In that case, we can only race against time, there are 30 to 40 tons of medical waste in the material pit to be treated, and the medical waste will continue to come in, if we don't receive it, then the medical waste will have nowhere to go." Production manager Liang Yan said.Another tricky problem is the winding and clogging of the feed. The protective clothing, infusion tube and other materials in the medical waste are long and soft, and the crushing system cannot be effectively broken. When passing through the double helix and scraper, entanglement and blockage often occur, so the entanglement needs to be manually removed at some key nodes to ensure normal material delivery.Although there are corresponding tools, employees still need to maintain the equipment by hand during the actual operation, contact with medical waste, even if wearing gloves, it is still full of risks, and this group of employees is also called "death squad" in the medical waste disposal work.During the peak period, the feeding amount is large, the entanglement and blocking of the material occur frequently, and the failure rate of the feeding scraper also increases. Once, at 11 o 'clock at noon, the equipment failed because of the medical waste wound, and it was also this batch of "death squad members" who put down their hands and just ate two bites of food, carried out emergency repairs, until the equipment was restored to operation, a total of 3 hours before and after, and then returned to the table, the food was already cold.The mixture of leather and needles in medical waste is extremely dangerous. During a cleaning process, two of the employees were accidentally stabbed by a needle, and the sharp needle pierced the glove and directly through the skin. What's inside the needle? Is it related to the epidemic? Do you have the virus? These need to be checked carefully. After the company found the situation, it immediately reported to the Nanjing epidemic prevention and control headquarters, and the Nanjing Health Commission urgently led employees to the Municipal People's Hospital for detailed examination, analysis and exclusion of infection risks, but fortunately no one was infected.Disposal of zero accidents, zero inventory of medical waste, zero infection of personnel, the efforts of all staff of Nanjing excellence handed over a successful answer sheet.The collaborative disposal of medical waste has also brought some losses to Nanjing Excellence, but the management team is very optimistic about it. "Although it has had a certain impact on our production indicators, but with such an excellent team, we believe that through optimization management and full efforts, we can make up for the loss of this part of capacity."Responsible, dare to take on, "be a responsible corporate citizen", this eye-catching slogan is still witnessing the extraordinary excellence of Nanjing."A group of lovely people"Supporting the sense of corporate responsibility is a "Nanjing outstanding people". Get up at 6:30 in the morning, go to the specific area at 8:00 to wear protective clothing, wear masks, goggles, gloves, and put on protective boots, while silently reading the process requirements, go to the medical waste disposal isolation area, conduct daily temperature detection at 8:30, and officially start work, killing, unloading... From this, the medical waste disposal team staff Dong Master a day's work began, this work, he did for nearly a month. From 8:30 in the morning to 8:30 at night, "fully armed" shift work for 12 hours a day, even if the provisions of continuous work for 2 hours must go to the rest room, but each time the Dong master who took off the protective suit, still "as if just out of the water." After a few mouthfuls, a short rest, and a new protective suit and mask, Dong is ready to work again with his colleagues.In the closed working area, there is not only medical waste, but also industrial waste, and the smell is filled in the entire closed area. The sweat in the protective mask is mixed with the sour smell, and the sweat is inhaled and the breathing is difficult, which has caused great trouble to the work of Master Dong. But he persisted from the beginning to the end, did not retreat, did not shout a bitter, said a tired.In fact, this is just a microcosm of Nanjing's outstanding medical waste disposal work. A total of 27 people like Dong, who are always fighting in the front line during the peak period, were transferred from the production Department and temporarily formed into a special team for medical waste disposal.Throughout the disposal process, the incineration workshop, storage workshop, landfill workshop, physical and chemical workshop, sewage workshop and other fully supported, a total of 400 batches of personnel before and after, more than 60 employees directly involved in the loading and unloading of medical waste, transfer, disposal. They are brave enough to fight on the front line, a set of soaked protective clothing, a pair of masks that can wring out sweat, and a sheet of forms filled with records, telling of their difficulties. At the peak, the medical waste in the pit was piled up like a hill, two or three meters above the ground, "we were afraid to look at it", and all the on-site personnel were highly nervous. The company issued a death order, all personnel will reach the mission, 24-hour shift uninterrupted work, to ensure that the medical waste is clear, do not stay at night, eliminate all infection hazards, even in the disposal of the peak period can be handled within 18 hours clean.It is such a group of lovely people, their firm faith, they are full of responsibility, their hearts are in the same place, the effort to work together, to win this hard battle. Photo/Nanjing Excellence Shen MiBy Miao Jiabin, Human Resources09-13