Recently, Snow Wave Environment and China Energy Conservation Tiehan Environmental Protection Group Co., Ltd. officially signed the "Shangluo household waste environmental power generation project flue gas purification and fly ash stabilization system complete equipment procurement contract".
Shangluo Municipal solid waste incineration power generation project adopts PPP model, covers an area of about 115 mu, invested by China Energy Conservation (Shangluo) Energy Co., LTD., the project mainly includes waste incineration power generation plant, kitchen waste treatment plant, waste incineration power generation slag disposal plant three plants. The main plant is designed to handle 1800 tons of domestic waste/day, with a total installed capacity of 37 MW. The project is divided into two phases. The first phase of the project will build two new incineration production lines with a processing capacity of 600 tons/day and an installed capacity of 25 MW. Supporting kitchen waste treatment production line, as the second heat source of residential heating in the central city, the service scope for domestic waste in Shangzhou, Luonan, Danfeng, Shangnan and some areas of Shanyang.
Snow wave environment will give full play to its technological advantages, cast high-quality projects, and help the construction of ecological civilization.