At 6 am on March 16, Shanghai Changying Environmental Protection Service Co., Ltd. received an urgent notice, requiring all employees of the company to complete two rounds of nucleic acid testing before 7 am on March 16 to 10 PM on March 17, and the whole plant implemented closed management, only in and out.
Epidemic situation is an order, and epidemic prevention is a responsibility. After receiving the notice, Shanghai Changying urgently held a special meeting on epidemic prevention and control to upgrade the deployment of epidemic prevention and control and production work. The meeting decided that in addition to daily temperature measurement, killing and other protective measures, from now on the whole factory upgrade control measures, strictly control the flow of internal staff, all staff wear masks, and require all employees in the factory are not necessary to leave the factory, foreign employees do not return to the factory, the implementation of online office.
Safety creates a barrier to epidemic prevention
Since the outbreak of the epidemic, the company in addition to the temperature detection of incoming personnel, health code inquiry and elimination work into the daily management, from the workshop production line, inside and outside the warehouse, to the elevator corridor, as well as the doorman received documents express, from outside to inside to strictly prevent the spread of the epidemic.
Together to overcome the "difficult" material support
By the evening of March 16, overnight emergency supplies had been distributed to all employees staying in the factory, including toothpaste, toothbrushes, bedding and pillows. Although the company's "accommodation" conditions are simple, some use sofas as beds, and some sleep on the floor, but no one complains.
Go all out to ensure production
As the company has just completed the overhaul of the hazardous waste incinerator, the refractory materials are in the stage of 7*24 hours baking furnace, so the production cannot be interrupted, and the warehouse was accumulated due to the equipment overhaul. In order to resume normal production as soon as possible, solve environmental problems for the waste production enterprises, and ensure the company's own environmental safety, after receiving the company's closed management notice, the colleagues of the baking furnace working group, Immediately respond to the call, quickly enter the company.
The production department is responsible for checking and cleaning the high calorific value pipe filters in the tank farm, kiln head and secondary combustion chamber, and the equipment department and the logistics and warehousing department coordinate and coordinate the procurement and warehouse reception plan.
During the period of closed management, Xu Lin, general manager of Shanghai Changying, took the lead in living in the company, commanding and coordinating various work on site; Employees in the plant stick to their posts to ensure the safe and orderly operation of the company; Employees who work from home complete every online task on time and stay on call at all times.
It is reported that up to now Shanghai Changying has resumed work in an orderly manner. The spread of the new coronavirus epidemic has forced Shanghai, a city that is rapidly rotating every day, to slow down its pace, but the epidemic will eventually pass. In this special period, all employees of Shanghai Changying are united in "facing the big exam and fighting hard", and interpret their responsibilities and responsibilities in their own posts.
By Shanghai Changying and Zhang Yaopei